Broker Scam & Fraud Alert
Thursday, 4 November 2021
Added transnational oil pipeline capacity could reduce crude oil shipped by rail
The Enbridge Line 3 replacement pipeline, which delivers crude oil from Edmonton, Alberta, in Canada to Superior, Wisconsin, became fully operational on October 1, 2021, increasing the pipeline's capacity to 760,000 barrels per day (b/d). Before the replacement, Enbridge Line 3 had a capacity of about half that amount. Because the Line 3 replacement project increases the capacity to import crude oil by pipeline from Canada, this pipeline could reduce the need to ship crude oil from Canada by other modes, especially rail. More »
Popular Tags:
Crude Oil News
,
Crude Oil Reviews
Subscribe to:
Post Comments
(
Atom
)
No comments :
Post a Comment